docs: add the final submission checklist (docs/FINAL-CHECKLIST.md)

This commit is contained in:
OmO Orchestrator committed 2026-11-20 16:08:09 -05:00
1 parent 4e654b3fc5
commit a87b7b2e53
2 files changed
+180

No files matched your search

@@ -0,0 +1,117 @@
# Todo 12 Evidence - Final "Aaron-only" Checklist
Task: create `docs/FINAL-CHECKLIST.md` listing, in order, the few things
only Aaron can do before submitting tonight. Every item must cite a
concrete artifact/URL that actually exists in the repo right now.
## 1. Final video filename - `ls -la e2e/openmotion/renders/`
```
drwxr-xr-x 2 1000 1000 4096 Nov 20 21:05 .
drwxr-xr-x 5 1000 1000 4096 Nov 20 21:05 ..
-rw-r--r-- 1 1000 1000 7870756 Nov 20 21:05 tour.mp4
-rw-r--r-- 1 1000 1000 44692370 Nov 20 21:05 full-v5.mp4
-rw-r--r-- 1 1000 1000 22687310 Nov 20 21:05 full-v2.mp4
-rw-r--r-- 1 1000 1000 46315716 Nov 20 21:05 full-v7.mp4
-rw-r--r-- 1 1000 1000 22811703 Nov 20 21:05 full-v3.mp4
-rw-r--r-- 1 1000 1000 12758095 Nov 20 21:05 full.mp4
-rw-r--r-- 1 1000 1000 45516667 Nov 20 21:05 full-v6.mp4
```
`full-v7.mp4` is the newest numbered render (todo 9's output). Confirmed
independently by `grep -n -A 15 "## Demo video" README.md`:
```
46:## Demo video
47-
48-The polished promo cut lives at
49-[`e2e/openmotion/renders/full-v7.mp4`](e2e/openmotion/renders/full-v7.mp4) - a
50-composited edit (real captured Playwright footage of the actual shipped UI,
51-never a mockup) over a signed-event-log ledger motif, ~89.9 seconds, well
52-within a short hackathon demo window. ...
```
README's own "Demo video" section names `full-v7.mp4` explicitly as "the
polished promo cut" - matches the directory listing. **Verified: the real
final filename is `e2e/openmotion/renders/full-v7.mp4`.**
## 2. Permanent live URL - `grep -n -A 10 -i "live.demo" README.md`
```
19:## Live demo
20-
21-**Try it:** [`https://first-place-overhaul-todo6.vercel.app`](https://first-place-overhaul-todo6.vercel.app)
22-- a permanent `vercel --prod` production deployment, not a temporary preview
23-link - it does not expire.
24-
25-This deploy is the **static frontend only**. The self-hosted sync/blob/admin
26-backend (`api/*`) is a separate, self-hosted-only component per this
27-project's standing no-managed-cloud-backend preference - it is never part of
28-this public URL. ...
```
**Verified: the real permanent URL is
`https://first-place-overhaul-todo6.vercel.app`.**
## 3. Supporting docs - `ls -la docs/`
```
drwxr-xr-x 2 1000 1000 4096 Nov 20 21:05 .
drwxr-xr-x 13 1000 1000 4096 Nov 20 21:05 ..
-rw-r--r-- 1 1000 1000 5053 Nov 20 21:05 SUBMISSION-ANSWERS.md
-rw-r--r-- 1 1000 1000 10004 Nov 20 21:05 promo-slides.md
-rw-r--r-- 1 1000 1000 10216 Nov 20 21:05 DEMO-VIDEO-SCRIPT.md
-rw-r--r-- 1 1000 1000 1275200 Nov 20 21:05 promo-slides.pptx
-rw-r--r-- 1 1000 1000 1410868 Nov 20 21:05 promo-slides.pdf
```
**Verified: `docs/SUBMISSION-ANSWERS.md` (5,053 bytes), `docs/promo-slides.pptx`
(1,275,200 bytes), and `docs/promo-slides.pdf` (1,410,868 bytes) all exist
and are non-empty.** Spot-checked `SUBMISSION-ANSWERS.md`'s head - it
contains 4 real labeled fields (Field 1 "Explain it directly...", etc.),
not placeholder text.
## 4. Repo state before this todo
`git status --short` was clean (working tree clean) and `git log --oneline -5`
showed todo 10's and 11's commits already landed:
```
4e654b3 chore(ulw-execute): close todo 10, record gate-review evidence and ledger
2583b51 docs(evidence): honest full 10-slide clipping verification for todo 10 fix
4228eff fix(docs): resolve Marp slide content clipping on Act/Epilogue ledger-entry cards
2474215 feat(docs): add a Marp slides deck mirroring the promo video (pptx+pdf)
c74b0d1 chore(ulw-execute): close todo 13, record gate-review evidence and ledger
```
## Checklist item count and deviation
`docs/FINAL-CHECKLIST.md` has **8 ordered items**, not the plan's originally
stated "exactly 7." The plan's own task instructions explicitly called for
this deviation: todo 10's slide deck (`docs/promo-slides.pptx`/`.pdf`) is a
real, already-built deliverable the original 7-item outline (drafted before
todo 10 existed in the plan) did not anticipate. It is included as its own
numbered item (item 5, optional) rather than silently dropped or merged
into another step. This is disclosed both in the checklist file itself and
here.
## Final checklist content (as written)
1. Open the real PatriotHacks submission portal and verify whether a
separate video-upload/video-link field exists - flagged as an open
assumption.
2. Paste the drafted answers from `docs/SUBMISSION-ANSWERS.md` into the 4
form fields.
3. Attach/link the final video `e2e/openmotion/renders/full-v7.mp4` -
Aaron's call if a hosted link is needed instead of a file upload.
4. Confirm the project/live-demo link field points at
`https://first-place-overhaul-todo6.vercel.app`.
5. (Optional) Share `docs/promo-slides.pptx` or `docs/promo-slides.pdf` if
the portal supports a slide-deck attachment.
6. Confirm "Sponsor tracks" stays unselected (already confirmed, none exist).
7. Do one final personal watch-through of the video end to end.
8. Click Submit before 11:59 PM EST tonight (2026-11-20).
All 8 items were cross-checked against the artifact-existence checks above
before writing the final file - no item references anything that does not
exist right now in this repo.
+63
View File
@@ -0,0 +1,63 @@
# Final Submission Checklist (Aaron-only)
Everything scriptable is done. This is the ordered list of what only you
(Aaron) can still do before submitting tonight. Every item below cites a
real, verified artifact already committed in this repo - nothing here is a
placeholder or a guess.
> **Deviation from the plan's original outline:** the plan's TL;DR described
> "7 ordered, Aaron-actionable items." This checklist has **8**. Todo 10 (the
> Marp slides deck, `docs/promo-slides.pptx`/`.pdf`) is a real deliverable
> this plan produced that the original 7-item outline (drafted before todo 10
> existed) didn't anticipate. Since it's a genuine, already-built artifact
> Aaron can optionally use, it gets its own numbered item (item 5) rather
> than being silently folded into another step or dropped. This is disclosed
> here, not hidden.
1. **Open the real PatriotHacks submission portal and check for a video field.**
Verify whether a separate video-upload or video-link field exists beyond
the 4 text-answer fields. This could **not** be verified from the pasted
form text alone earlier in this session - treat it as an open assumption
until you look at the live portal yourself.
2. **Paste the drafted answers into the 4 form fields.**
The drafted text is in [`docs/SUBMISSION-ANSWERS.md`](./SUBMISSION-ANSWERS.md)
(verified present, 4 labeled fields, each under the 200-word limit).
Copy each field's answer into its matching form field.
3. **Attach or link the final video.**
The final render is
[`e2e/openmotion/renders/full-v7.mp4`](../e2e/openmotion/renders/full-v7.mp4)
- confirmed by directly listing `e2e/openmotion/renders/` just now: it is
the newest numbered render (full-v7.mp4, ~46.3 MB), and it is the file
README.md's own "## Demo video" section already names as "the polished
promo cut." If the portal wants a hosted link rather than a raw file
upload, upload it yourself to a host of your choice (YouTube unlisted,
Google Drive, etc.) - that choice is yours, not scriptable.
4. **Point the project/live-demo link field at the permanent URL.**
If the real portal has a project-link or live-demo-link field, use
exactly:
`https://first-place-overhaul-todo6.vercel.app`
This is confirmed, byte-for-byte, from README.md's "## Live demo" section
right now - a permanent `vercel --prod` production deployment, not a
temporary preview link.
5. **(Optional) Share the slide deck if the portal supports an attachment.**
[`docs/promo-slides.pptx`](./promo-slides.pptx) and
[`docs/promo-slides.pdf`](./promo-slides.pdf) both exist (confirmed via
`ls -la docs/`: pptx 1,275,200 bytes, pdf 1,410,868 bytes) and mirror the
promo video beat-for-beat. Not required - attach only if the form has a
slot for it.
6. **Confirm "Sponsor tracks" stays unselected.**
Already confirmed this session: no sponsor tracks exist for this event.
Leave it unselected/blank.
7. **Do one final personal watch-through of the video, end to end.**
A human sanity check only you can do - watch `full-v7.mp4` straight
through before it goes out the door.
8. **Click Submit before 11:59 PM EST tonight (2026-11-20).**
This is the hard deadline. Everything above this line is prep; this step
is the one that actually counts.